Company: Afrima Consulting & TNB Malaysia
Length: March 2019 - September 2019
Services provided:
Uprating of an existing 275kV OHL and from Kapar Sub to proposed new Paya Jaras Sub (conductor replacement), 23km line with 72 towers. Tasks included condition assessment, site survey (to collect data), conductor replacement study and conductor replacement design to upgrade the line
Company: Afrima Consulting & Trenergy Infrastructure
Length: March 2018 - September 2018
Services provided:
275kV DC line AP26 Tower Failure Analysis and Report.
Company: Afrima Consulting & SEPCOM Malaysia
Length: March 2015 - September 2016
Services provided:
New section design and condition assessment of existing asset/sections for the 33kV Hulu Terengganu Hydroelectric Project.
Company: Afrima Consulting & TNB Malaysia
Length: June 2014 - August 2014
Services provided:
Complete re-design with new loading calculations of a 500kV Double Circuit Suspension tower.
Company: Rohas-Euco Industries & TNB Malaysia
Length: January 2009 - June 2010
Services provided:
Conceptual steel monopole family design for double circuit (132kV and 275kV) and quadruple circuit (132kV/132kV, 132kV/275kV and 275kV/275kV).
Company: Afrima Consulting & PESTECH Cambodia/ Diamond Power LMTD
Length: Feburary 2017- January 2018
Services provided:
Complete structural design and detailing for 230 kV Kampong Cham Kratie Transmission Substation (20 structures).
Company: Afrima Consulting & PESTECH Cambodia
Length: March 2014 - December 2014
Services provided:
PLS Cadd spotting and optimization for 230kV Double Circuit line with 443 towers.
Company: Afrima Consulting & PESTECH Cambodia
Length: March 2014 - December 2014
Services provided:
Five type towers detailed design, GA/shop drawings and bill of material for 230kV West Phnom Penh to Sihanoukville Transmission Line.